Our Guide to Kitchen Extensions

Open Plan Kitchen Extension 2026/03 built by Allgood Construction. Wide open plan space, with herringbone floor finish.

There’s a lot involved with the average open-plan kitchen extension.

Usually we’re removing a wall from the back of the house and replacing it with a rolled steel joist (or RSJ), there’s often work involving moving drains, and fitting a new kitchen into a space that didn’t exist before.

The purpose of the guide is to give you the benefit of our experience in building this type of extension, so you know what you expect, and how to build the kitchen of your dreams.

In our experience, there are a few key decisions to make:

  1. How open do you want the space to be?
  2. Which walls need to be removed to get the configuration which works for your home?
  3. Where are your sink, hob, and extraction fan going? This influences drainage and ducting.
  4. How are you going to light and heat a much bigger room?

Do you need Planning Permission or Building Control?

Sometimes you need planning permission (but other times, it’s permitted development), and yes, you always need building control for any kind of house extension. We explore this thoroughly across our guide to permitted development rights, our article on planning permission vs Building Regulations, and our detailed coverage of what building control actually is and when you need it.

Many single storey extensions can be built under permitted development (which removes the need for planning), but all house extensions require building control approval, the only exception is conservatories in some cases.

We always emphasise that this is a positive thing, building control exists to ensure that your house extension is compliant, it helps to ensure that you know that what you are getting built is legal and has been built well.

Defining what type of kitchen you want

The majority of our customers want a fully open-plan kitchen and dining space. If you take a look at our projects then you’ll see the this is the bulk of work that we carry out.

However, there are a few variations on this theme:

  • Fully open plan kitchens. One single large room for cooking, eating, and relaxing. Obviously, this means that noise and cooking smells travel through the entirety o the space, but it is also deeply social, ensuring that whoever is doing the cooking is also interacting with family or guests rather than being sequestered in their own room.
  • Broken plan kitchens. This is where you have a mostly open space but partly divided by a wall, glazed screen or shelving. Sometimes these kitchens are practical, and intended to minimise the cost of major structural alterations. Other times, customers want a broken plan kitchen to create some distinction between the different ‘zones’ of the open plan space.
  • A secondary kitchen (sometimes called a scullery, if you’re feeling heritage-inspired). Occasionally on larger projects customers want a ‘show’ kitchen in the main open-plan space and a second, more practical kitchen, for day-today cooking, cooking prep and more odorous cooking. This is less common, but has practical purpose in giving you the option to contain smells and mess away from the main space.
  • Separate utility rooms. If a customer has space and budget, it isn’t uncommon to want a separate space for the washing machine and dryer.
  • Dedicated walk-in pantry space. This is not an uncommon choice for customers who have the budget, space, and storage needs, and was a feature of this two storey extension in Bury that we built.

Consider fully what features you want, and what features you need. How do you cook? How do you live in the space?  How is your family going to interact with the new open-kitchen space? These are all the starting points before we get onto planning the layout.

Planning your kitchen layout

In the first instance, we encourage you to think about open-plan kitchens as three ‘zones’.

These include the cooking zone (where you’ll need to think about the island or peninsula, the appliances, and the general utility of the space), the dining zone, and the living zone.

There’s always the question about whether you want the dining or the living space to be closer to the garden. Will you get more satisfaction from a ‘statement’ dining area which is close to the garden, or a relaxed living area with green views. You’ll probably spend more of your time in the living zone, but this choice is always deeply personal and varies from customer to customer.

Bear in mind that you can create some spatial distinction through your choice of lighting, flooring, and furniture, while preserving all of the benefits of open plan living.

Also, bear in mind that some decisions will have to be made early.

We recommend waiting until the shell of the extension is built before finalising the detailed kitchen design (more on that below). However, some decisions get locked in much earlier, and changing them later is expensive:

  • Where do you want the roof lantern or glazing?
  • Which walls do you want to remove? And how much of them?
  • Where is the sink going to be? This changes the drainage and if the sink is in the island we’ll need to ensure that we have a drain in place.
  • Where are the doors going to go, and how to they affect your interior decisions?

Take all of these questions into account at the planning stage, and have a rough idea of how you want the space to function that we can add detail onto once we’ve finished the build.

Once the shell (i.e. the roof and walls) are up, it’s much easier to see how your kitchen is going to work than when it’s just a plan on paper. What we usually recommend is to wait until the shell has been completed and then physically cut out cardboard to imitate the layout of your new kitchen and see how much space you’ve really got to work with.

How do knock-throughs work on your kitchen extension?

When we’re creating a single open space, that usually involves removing some if not all of the rear wall of the home. It may also include removing an internal wall, which is what we did on this open-plan kitchen diner in Warrington (to remove the wall between the original dining room and kitchen.

When we’re dealing with a structural wall, it will have to be replaced by a steel beam (also called an RSJ or Rolled Steel Joist). This will need structural calculations from a qualified structural engineer, columns or brick pillars to rest the steel on, fireboard around the steel and building control sign off.

The more walls you remove, and the wider the opening, the bigger and more expensive the steels become. This makes planning around the budget very important. There are a few risk factors around pilling [link], and if you’re in a timber-framed house that can complicate the structural calculations.

Drainage Considerations

This is an important consideration, often the soil stack, drainage, and kitchen waste run by the rear wall of the property. This is not always the case though.

It does mean we might have to consider:

  • Moving the soil stack
  • Diverting or protecting drains
  • Extending heating or

The position of the drains has a big effect on where your sink and dishwasher can go. For example, if your sink is going in the middle of your island, we need to ensure that we put the waste pipe in when we’re pouring the slab.

How the roof affects your kitchen extension

There’s a few different options for the roof on your extension. The simplest roof (and usually cheapest) is a lean-to roof with several glazed panels. This type of roof is the norm for house extensions with a projection of up to 3.5m, they can have glazed panels in the roof which brings a huge amount of light into the space.  

We’ve written a guide to the different types of roof but spend some time thinking about how exactly you want the roof to look. Roofs with a clear apex (such as a double hipped Edwardian or Gable Roof) are perfect for hanging lights, which can look odd on a lean-to roof.

On the other hand, flat roofs tend to really suit spotlights and pyramid lanterns can make fantastic statement glazing options which can set over a dining table or kitchen island. There’s a lot of options to consider, so spend some time thinking about how exactly you want the space to look, both inside and out.

What doors to pick?

This is an important question. Bifold doors do one thing which other doors cannot, which is open up the whole rear wall and minimise the distinction between garden and home.

Sliding doors can do something similar, and we have installed multi-panel sliding doors [link to Nora’s job] but there is still a limit to how much they open because they will have a fixed panel.

French doors are the more affordable option, and can be highly practical.

See French vs sliding vs bifold doors to explore all the benefits and disadvantages of the three options.

We’d also recommend to think about how the door placement and size affects the room from a movement perspective. Where there is a door, you create a corridor, which affects furniture placement and movement.

How to Heat an open-plan space

This is often something which customers forget, but it’s critical that you consider how to heat your new, open-plan living space. Electric and traditional radiators are both options, and are available in a range of products and aesthetics which can suit any space.

Underfloor heating is one of those topics that customers are very interested in, and while we’ve explored underfloor heating in detail elsewhere {link] it’s worth mentioning here to. In short, there’s two types:

  • Wet underfloor heating, which is cheaper to run but more expensive to install, and heats slowly and evenly. However, it may require boiler upgrades which can be an expensive extra cost.
  • Electric underfloor heating, which is more expensive to run, cheaper to install, and farms up faster than wet systems.

Underfloor heating has different thermal dynamics to radiators. Radiators heat the air next to them, which rises and circulates. This means the room can feel warm near the radiator and cooler elsewhere. Underfloor heating warms the whole floor, which then radiates gently and evenly across the room.

One thing to be aware of if you’re planning for a wood floor, the floor surface typically should not exceed 27°C, so tiles can be a more practical option.

Choosing your kitchen

We regularly install kitchens as part of our kitchen extension projects, and we’re happy to work with your own supplier, we also supply and fit Howdens kitchens.

We’ve used Howdens for years because:

  • They keep a large range in stock, which minimises waiting.
  • Turnaround is quick once the design is agreed and an order can arrive within days.
  • The quality is high and at a fair price.
  • Their aftercare has, in our experience, always been fantastic.

Ultimately, your choice of kitchen supplier is up to you. We recommend visiting their show room and having a clear vision of what you’re looking for in your kitchen. There are a range of popular styles, ranging from contemporary to shaker, be clear about what you’re looking for.

Think about the electrics early

Electrical costs are often unfortunate surprises when customers are looking at kitchen extensions. The extension and the kitchen are separate jobs, and kitchen electrics cannot be priced until a kitchen design has been agreed upon.

For our part, we try to be as transparent as possible and the costs for any additional electrics is covered by the standard prices on the back of our extension contract. Quotes will always cover a standard electrical package for the room (which is set out in the technical specification, and then on the final contract).

However, this something that we always warn customers about. Especially since some customers want under-cabinet and plinth lighting, built-in LED strip lighting (which is very popular right now), and other expensive finishes.

It’s also important to be aware that you might need separate circuits for the oven, hob and other large appliances, and your consumer unit may need to be upgraded.

All of this work must be carried out by a registered electrician, all electrical work in a home must meet Part P of the Building Regulations. Installing a new circuit or replacing a consumer unit is notifiable work. That means it has to be either signed off by building control, or carried out and self-certified by an electrician registered with a competent person scheme.

All of our electrical work is carried out by an NICEIC-registered electrician, and you’ll receive the certificates when it’s done.

Can you save money on your kitchen extension using a modular build?

The answer to this is often yes, but it depends on the system. If we are using a timber-framed modular structural insulated panel (SIP) extension system then they can save you money (which, in our experience, is often redirected towards the kitchen!). They can especially save you money if you have an existing conservatory base.

However, this is always a bespoke process, and you should talk to us and we can explore and price both a traditional and modular extension so that you can compare the quotes.

Common Mistakes to Avoid When Planning your Kitchen Extension

  • An island that’s too big. In an extension that’s long but not particularly wide, an oversized island clutters the room and gets in the way.
  • Putting the sink in the island. It sounds sociable, but a sink in the island quickly becomes a magnet for dirty dishes and clutter in the middle of your living space. It also means running waste pipes under the floor. A hob or a clear prep surface on the island often works better.
  • Losing storage when the walls come down. Knocking through removes walls that used to hold wall cabinets. Plan in tall larder units or a pantry to make up for it.
  • Leaving extraction until last. A hob on an island needs a ceiling extractor or a downdraft extractor, plus a route for the ducting. Decide this before the roof and ceiling go in.
  • Doors that eat the kitchen. Folded-back bifold panels, or a door that swings into the room, can take up the space you’d planned for units or a table.
  • Planning sockets and lighting too late. Work out where the TV, sofa, island sockets and charging points go before first fix. Moving them later means chasing out new plaster.
  • Forgetting about heat and glare. A south-facing room with a large lantern can overheat. Consider solar control glass or blinds.
  • Ignoring echo. Hard floors, glass and worktops make open-plan rooms noisy. Rugs, soft furnishings and fabric seating help.
  • Forgetting the bins. Plan built-in space for rubbish and recycling. It’s one of the most common regrets in new kitchens.

Talk to us about your open-plan kitchen extension

We design and build open-plan kitchen extensions across the North West, from the groundwork and steels right through to the finished Howdens kitchen. If you’re thinking about knocking through and extending, get in touch with Allgood Construction. We’ll come and look at your home, talk you through what’s possible, and help you plan a space that works for the way you live.