If you’re looking at building an extension, one of the first questions you’ll probably ask is whether or not you need an architect. In England, there is no general legal requirement to hire an architect for an extension to your home. For a straightforward home extension within your permitted development rights, a design-and-build contractor (such as Allgood Construction) will be able to provide the design work that you need.
It’s a common misconception that all extensions require an architect’s input. We often encounter customers who have paid for separate architectural drawings for permitted development extensions, when we could have carried out the design work as part of our free quotation process.
However, there are still many instances where we would strongly recommend getting an architect involved, particularly where you need planning permission or prior approval, or where you’re looking for a more unusual design.
Is it a legal requirement to use an architect?
Whether your extension falls under permitted development, requires prior approval, or needs a householder planning application, there is no general requirement for the drawings to be produced by an architect.
Depending on the project and the competence of the people involved, you can:
- Prepare your own drawings.
- Use an architectural technologist, technician or residential designer.
- Have a design-and-build contractor provide the design.
However, the title ‘architect’ is legally protected. Only individuals registered with the Architects Registration Board (ARB) can describe themselves as architects in connection with architectural practice. As the ARB explains, people who are not registered architects can legally provide architectural services.
That distinction matters, because paying someone to produce drawings does not necessarily mean that you are employing an architect. Before appointing someone, make sure you understand their qualifications, relevant experience and what their service actually includes.
When do you recommend using an architect?
At Allgood Construction (NW), we strongly recommend involving an architect where your extension needs prior approval or a full householder planning application. Most front extensions, for example, fall outside permitted development and need full planning permission.
Theoretically, a homeowner or contractor can prepare and submit planning drawings. However, the reality is that planning applications can be complex, and the proposal needs to take into account:
- The property itself.
- The property’s surroundings and neighbouring homes (see our guide to when your neighbours can object to your extension).
- National, local (and sometimes neighbourhood) planning policies which may apply.
In our experience, a qualified architect with a good understanding of the local planning situation is best placed to navigate these considerations and give your application the best chance of approval. They have specialist training and experience that helps them identify potential problems before a planning application is submitted, and address them.
We have seen customers who commissioned drawings from draughtspersons and technicians and had poor experiences, which is one of the primary reasons we recommend an architect for this stage.
We also strongly recommend using an architect if what you’re looking for is unique, influenced by a specific architectural style (e.g. Bauhaus), or built to a specialist standard such as Passivhaus. If you are intending to go for something very ‘architectural’, then an architect who understands that style and can translate it into a clear, practical design is incredibly valuable.
Do I need an architect for a prior approval extension?
Although an architect is not legally required, we recommend using one to prepare the proposal, check that it meets the relevant rules, and deal with any issues raised during the process.
Prior approval extensions do not automatically require the same full drawing package as a householder planning application. However, the council will still need certain information, including:
- A written description with specified dimensions.
- A site plan showing the proposed development and relevant existing extensions.
- Adjoining property addresses.
- Contact details.
The Planning Portal’s larger home extension guidance explains the requirements.
The council can also request further information where necessary to assess the proposal.
When don’t you need a separate architect for a house extension?
For straightforward extensions that fall within permitted development, customers may find that the design work they need is already covered by our design-and-build approach.
In practice, we can design these extensions using our CAD software to establish the layout, dimensions and appearance of the proposed work. Our initial design work also considers how you want to use the space, how it connects with the existing house, and practical issues such as the position of doors, windows and rooflights.
For a house extension that meets the ordinary permitted development rules and does not require prior approval, there is generally no requirement to notify the council’s planning department. This is separate from the building control process.
Do I need a Lawful Development Certificate?
You can also apply for a Lawful Development Certificate. This provides formal confirmation that the proposal described in the application is lawful in planning terms. It is not compulsory, but it can provide useful certainty and evidence when you come to sell your home. The application needs enough accurate information for the council to assess the proposal.
The government’s guidance on Lawful Development Certificates explains how the process works.
If I have an architect, do I need structural calculations?
You may still need structural calculations, particularly where you are creating openings in load-bearing walls or using a roof or structural arrangement that requires specific engineering. An architect can coordinate that work, but appointing an architect does not automatically mean that structural engineering is included in their fee.
Your extension will also need the relevant building control application, inspections and completion process, regardless of whether it requires a planning application or a separate architect.
What should I check before paying for drawings?
Before commissioning drawings, speak to your proposed contractor and establish what design work they already provide.
At Allgood Construction (NW), we carry out initial design work as part of developing the project with our customers. For a straightforward extension, this can avoid paying separately for work that we would otherwise provide.
If you are getting quotes from several builders, however, an architect can help prepare a common set of drawings and a clear specification. This helps ensure that all the builders are singing from the same hymn sheet about what they are pricing, including the layout, materials, finishes and extent of the work. (Our guide to why house extension quotes are so different explains why this matters.)
Before appointing an architect or another designer, check whether their fee includes:
- The initial design and any revisions.
- Planning or prior approval applications.
- Building regulations drawings and specifications.
- Structural engineering.
- Detailed construction information.
- Advice or involvement during the building work.




