Building Control can be a daunting concept for those looking to take on a new home extension project. In this blog post, we've aimed to simplify the technical terms and explain a little about building regulations, building control process and to give you a bit of context on why it’s important.
What Is Building Control?
The first modern national building standards were introduced by the Building
Regulations 1965 (SI 1965/1373) which set out the first national standards for
building regulation in the UK. These regulations set out what qualified as ‘building
work’, notification processes, and requirements for building design and construction.
The Building Regulations 2010 (SI 2010/2214) significantly rewrote building
regulation in England and Wales. This devolved building regulation authority for
Wales and radically changed several sections of building regulations. However, this
devolution is something that you should be aware of, building regulation rules may
and do vary between England, Wales and Scotland.
There have been further amendments under Building (Amendment) Regulations 2018 and Building (Amendment) Regulations 2023 and similar legislation and regulation.
There are currently eighteen parts to building regulations and you can find the
Approved Documents explaining these rules on the Government Planning Portal.

How Do Building Regulations Work?
At Allgood Construction we take building regulations compliance very seriously.
Under the Building Safety Act 2022 we have duty holder responsibility for the
construction projects that we work on. This means that we have a legal obligation to
plan, manage and cooperate with other key stakeholders (including you, the client) to
ensure that what we build is building regulation compliant.
Furthermore, it is a criminal offence under the Building Act 1984 and Building Safety
Act 2022 for us to breech building regulation. Offenders may face prosecution,
including unlimited fines and up to two years in prison if we were to do so.
At every step we have a robust quality control process including required photo
guidelines for our workers and sub-contractors requiring photographic evidence of
key elements at every step of the job, so that we can evidence, if required, every
element of our build.
This is true for all projects, whether you're looking for a new home extension, conservatory, orangery or roof replacement. We also have regular and consistent inspections from our senior leadership team of the build as they progress through their stages. This is in addition to the normal building inspection process.

Building Control Bodies
UK building regulations requires independent verification of building regulations
compliance through a Building Control Body (BCB). These BCBs are responsible for
the verification process, and this role has historically been carried out by local
authorities. However, under section 49 of the Building Act 1984 Parliament created
the statutory framework for private individuals or bodies to act as ‘Approved
Inspectors’ now referred to as Registered Building Control Approvers (or RBCAs).
These Registered Building Control Approvers are authorised by the Building Safety
Regulator (BSR) to carry out the inspection process. RCBAs must be registered with
the Building Safety Regulator and re-appointed to their role. They are also required
to have insurance from a scheme approved by the Secretary of State. The Building
Safety Regulator also manages performance standards and rules to ensure safety,
maintain standards and ensure competence oversight.
What is The Difference Between Local Authority Building Control & Registered Building Control Approvers?
There are a few key differences between Local Authority Building Control and
Registered Building Control Approvers. The first being that Local Authority
Inspectors are representatives of the State, they have statutory enforcement powers
under section 35 and section 36 of the Building Act 1984, and their decisions are
matters of public law, protected by statutory authority and subject to judicial review.
As a result, the decisions by Local Authority Building Control carry statutory authority
and require formal processes to challenge. In our experience, there is variance
between Local Authorities on the interpretation of building regulations rules where
there are any ‘grey areas’ within the existing regulations. This means that, when
working with Local Authority Inspectors, early and continuous engagement is critical
and establishing clear expectations is vital. You can find more detail on some of the
scope for variance on our Planning Permission vs Building Regulations article.
Registered Building Control Approvers do not carry the same legal powers as Local
Authority Inspectors, although they are able to certify your projects. They cannot
prosecute, issue enforcement notices or compel works. However, in the case of non-
compliance with building regulations they can and will cancel the initial notice issued
to the Local Authority and the issue will revert to the Local Authority Inspectors.
In our experience, Registered Building Control Approvers will have a uniform
interpretation of building regulations across their inspectors. This ensures that you
have clear expectations across projects and can easily develop established ways of
working together to ensure that communication is easier and projects develop
smoother.
What Impact Do Building Regulations Have?
Local Authority Inspectors also carry the risk that they will raise other issues of non-
compliance. When a Local Authority Inspector visits your property, their powers
relate to contraventions of building regulations not individual projects. This might
range from something relatively minor, like missing trickle vents on windows to more
serious violations of building regulations.
Most Registered Building Control Approvers will focus on the individual project that they have been contracted for, and are highly unlikely to flag other areas of non-compliance where it is irrelevant to their contracted work.
It’s also important to note that different Building Control Bodies have different
approaches to verify building regulation compliance. Some Building Control Bodies
rely on a combination of live video streaming, photos and recorded videos to verify compliance. Others rely on physical inspections in addition to geo-located
photographs.
While this is legal, at Allgood Construction (NW) Ltd we believe that in-person
inspections offer the more robust process to verify compliance and give customers
the peace of mind that their build is fully up to specification.
We’re perfectly happy to work with our preferred Registered Building Control Approver, or Local Authority Inspectors as is the customers preference. However, we avoid Registered Building Control Approvers which do not use in-person site visits as part of their compliance process.

How Does Allgood Construction Comply With Building Regulations?
In the first instance, either full plans or a building notice will have to be issued to the
local authority. After that, there will be a series of inspections that will be carried out
to ensure compliance. These will vary based on the nature and extent of the works
being undertaken, but will usually be placed at key stages in the project.
For large projects, these stages are likely to be:
Commencement of project
Excavation
Foundations
Laying of Damp Proof Coursing
Installation of new drains
Construction of the primary structure
Installation of insulation
Roof construction
Completion
For smaller extensions, the stages are usually fewer in number, and we tend to have
the following inspections:
Foundation excavation
Slab construction (this will include damp proof coursing and slab insulation)
Roof and structural (i.e. checking the installation steel elements where we
have removed walls to open up a space)
Practical Completion
Throughout this process the Building Control Body will share their reports with you,
as the householder. At the excavation stage is where we might encounter the need
for piling. The decision to pile will be made based on the findings of the building
inspector, and you can find more information on piling here.
If you're looking to enhance your home with a new home extension that adheres to all building control regulations, get in touch with our team of experts today. At Allgood Construction, we're proud of our expertise and we're always happy to help offer advice. Enhance your home with a free, no-obligation quote today.
Disclaimer: These blog posts reflect the experience and opinion of our organisation
as primary contractors working in the construction sector. We are not Registered
Building Control Approvers, legal professionals, planning professionals or affiliated
with any Local Planning Authority. We will always recommend that our customer
seek guidance from their Local Planning Authority on all matters relating to planning
permission or building regulations and it is your responsibility to do so.